Simoco Projects
Header03
PT. Simoco Indonesia • Jl. Dr. Saharjo no. 242 Jakarta 12870 Indonesia • Phone: +62 21 829 4555 Fax: +62 21 8370 2420 e-mail: sales@simoco.co.id

















 
  • Mining Sector
  • Oil and Gas Sector
  • Transportation
  • Public Utilities
  • Port Authority



►PT. Freeport Indonesia


Installation of trunked radio system for 5 repeater-sites in Tembagapura area and each site with 10 channels capacity. The number of terminal operates at the moment is approx. 500 portables/mobiles. PT. Simoco Indonesia and PT. Jastrindo were responsible for the engineering, supply of towers, project management, implementation and commissioning of the system.

Freeport01 Freeport02

►PT. Newmont Minahasa Raya

Installation of 4 channels radio system that can cover mining area up to the port-side with around 50 portables/mobile radios. The radio system is controlled by a M-87 controller that can control max. 7 lines at the same time. We were responsible for the engineering, supply of tower (10m SST), project management, implementation and commissioning of the system.

►PT. Newmont NusaTenggara

Installation of radio system. This is an integrated radio communication system with 31 base-/repeaterstations, distributed over 3 repeater sites. The system supports about 600 subscribers of portable radio (as well HT as mobile). Two of the repeater-sites are green-field sites. The system utilises voting and scanning techniques to enable mobiles and portables to roam between sites. The Automatic Number Identification (ANI) is feature on this system. We were responsible for design, engineering, logistics, supply of tower/shelters/power system (generators, etc.), project management, implementation and the commissioning.

Newmont01 Newmont02 Newmont03

►PT. Kobatin

Installation of single site conventional radio system.



► PT. Total Indonesié

Installation of Simoco Multisite RTX2000 trunked radio system for 7 sites in East-Kalimantan and with total number of channel installed is approx. 35 channels. The number of terminal operating on the system is approx. 1500 portables/mobiles. PT. Simoco Indonesia was responsible for the engineering, project management, implementation and commissioning of the system. This system is a rental network, run by our agent PT. Alssa Corporindo.

Total

► PT. Vico Indonesia

Installation of Tait Multisite trunked radio system for 5 sites in East-Kalimantan. The total number of channel installed is approx. 23 channels. The number of terminal operating in the system is approx. 1000 portables/mobiles. PT. Simoco Indonesia was responsible for engineering, project management, implementation and commissioning of the system. This system is also a rental network, run by our agent PT. Alssa Corporindo.

► PT. Unocal Indonesia

Installation of Tait Multisite trunked radio system for 2 sites in East-Kalimantan and with total number of channel installed is approx. 12 channels. And the number of terminal operating in the system is approx. 500 portables/mobiles. We were responsible for engineering, project management, implementation and commissioning of the system. It is a rental network, run by our agent PT. Alssa Corporindo.

► Pertamina Lekomaras

Installation of 2 sites conventional network with telephone to radio connection. This is a rental network, maintained by PT. Simoco Indonesia.



► PT. Kereta Api Indonesia (Indonesian Railways)

1. Refurbishment of PT. KAI Voting RACE Network in Java, providing Simoco TSF2000 basestation, voting module, dispatch position, station radio and locomotive radio.

2. Installation of Microwave Radio Link for ticketing system of PT. KAI. We have supplied and installed microwave links for Jakarta, Surabaya and Bandung. Moreover, our microwave links have also been installed between Manggarai-Depok and Bogor station for their signalling and communication system. And PT. Simoco Indonesia was responsible for the design, engineering, logistics, supply, implementation and the commissioning.

3. PT. KAI North Sumatra Digital Radio Communication Network
Installation of P25 digital fixed mobiles at over 30 train stations from Medan to Rantauprapat. The installation included consoles and voice recording system. Designed, installed and commissioned by PT. Simoco Indonesia.

Railway01 Railway02 Railway03 Railway04 Railway05

► Satker Departemen Perhubungan (Transportation Office)

Installation of 6 dispatch consoles network for greater Jabotabek. The system employs fully redundant IP-Switch. Designed, developed, manufactured and installed by PT. Simoco Indonesia.

► Tanzania Railways

This project was undertaken together with Vialis NMA, Holland. Simoco DX4000 touch-screen train dispatch system providing station to station and station to train communications for 20 stations in Africa. TSF2000 Simoco Conventional Base stations were installed at all 20 railway stations. Approximately 230 mobiles and portables operate in the network. PT. Simoco Indonesia (Radio Commissioning) and NOKIA (Fibre Optic Communication Network) worked through Vialis NMA, the main contractor for the project. PT. Simoco Indonesia has supplied, installed and commissioned the radio network and provided subsequent the operational and the engineering training in both the Netherlands and Tanzania.

Tanzania01 Tanzania02 Tanzania03 Tanzania04 Tanzania05

► PT. LEN Industry

Installation of multisite voting network in North Sumatra for PT. KAI. Utilizing TSF2000 Base station and Simoco RACE Voting Module and Dispatch Station. The network span rail-link form Medan to Rantauprapat and Pematang Siantar.



► PT. Perusahaan Listrik Negara

Installation of radio link system for State Electricity Board, used as a backup for the operational electricity distribution network in South Sulawesi. The radio link system passes over 7 PLN offices from Makassar up to gardu induk Bakaru. PT. Simoco Indonesia was responsible for designing, engineering, logistics, project management, implementation and commissioning of the system.

PLN03

► PT. Perusahaan Listrik Negara (PLN) Region IX Maluku

Installation of radio system for all area of Maluku Province (from Wonreli/Serwaru of Wetar Island in southern part of Maluku up to Bere-Bere in Morotai Island in northern part of Ternate) with total of 86 PLN offices and 13 green-field repeater sites. The project was divided into 3 phases. Phase 1 for the infrastructure (backbone only), Phase 2 for the implementation of the radios to the offices and Phase 3 for the suboffices/data communication and also workshop setup. PT. Simoco Indonesia was responsible for designing, engineering, preparing the masterplan, logistics, supply of towers/shelters/power system (solar power, etc.), project management, implementation and commissioning, including integration with the landlines.


► PT. Perusahaan Listrik Negara (PLN) Region VII Suluttenggo

Installation of VHF link from Manado to Gorontalo. Seven site backbones for voice communication (as PLN Makassar).

PLN01 PLN02

► PT. Icomnet Plus

Installation of 2 hop digital PMX microwaves from Gandul to Tangerang. This is a rental network, installed and maintained by PT. Simoco Indonesia.



► PT. Jakarta International Container Terminal

Installation of Simoco Xfin MPT trunked radio system with 7 channels single-site for JICT crane operator. The number of terminal on the system is approx. 234 portables/mobiles. And PT. Simoco Indonesia was responsible for the engineering, project management, implementation and commissioning of the system.


JICT01 JICT02 JICT03 JICT04 JICT05

 

 

 

 

 


 

Home Business ActivitiesProjectsContact Us

© 2009. All rights reserved by Simoco Indonesia